A post and panel system promising to speed the installation of edge protection in floor to soffit situations in order to save contractors time has been launched by Ischebeck Titan. Branded Speeedpost, it is claimed to be up to ten times faster to install than typical e systems Twenty metres of edge protection can be installed in less than 10 minutes.