Sign up for the Building Products Email Newsletter Click here
Product Review - Lafarge Plasterboard Ltd
Mall drylined - Lafarge Plasterboard Ltd
Lafarge Plasterboard has supplied all the drylining requirements for the recently opened Jackson Square shopping centre extension in Bishops Stortford.
Conneely Drylining has installed Lafarge's Firecheck wall board throughout the 100,000 square foot retail mall, including the complex high ceiling. The mall features 8.5m high partitions which were constructed using the company's 146mm C Stud to achieve the necessary height and stability. These showcase telescopic deflection heads with fire umbrellas constructed on site to allow for the anticipated downward deflection.
The structural steel columns were fire protected using Lafarge's Cormet column and beam clip system. The system is simple to install and can provide up to 180 minutes fire protection.