Engineers at Dudley MDC came up with a novel solution when replacing an unstable 100 year-old brick retaining wall in Stourbridge. The wall, built within a densely packed residential area, formed the lower 2.5-3m of a 7m high embankment separating two streets. Dudley designed a radical masonry-faced piled retaining wall solution, which satisfied strict engineering criteria.