Croke Park stadium in Dublin has installed three Buderus commercial boilers.
The cast iron GE615 1200kW output boilers have been chosen for their high efficiency, reliability and installation benefits.
They are said to be suited for situations where economy and running costs, as well as low investment and low planning and installation costs are specific requirements. The boilers can achieve up to 96% Net Calorific Value with low flue gas temperatures and effective all round thermal insulation. Using patented Thermostream technology the boilers have been installed without a minimum return temperature and minimum flow rate removing the need for additional pumps and mixing valves.