CEMEX has supplied its ReadyFloor Beam and Block flooring system for the refurbishment of an old Welsh theatre. The Arad Goch Theatre Company needed a new premises. So when an adjacent building became available, a project to develop a contemporary theatre began. ReadyFloor pre-stressed concrete beams were used during the project.
As part of an extension to a school in Somerset, Cemex has supplied its ReadyFloor beam and block flooring system. The 225mm deep beams were supplied before the start of school to avoid disruption. Pre-stressed concrete beams were laid onto the foundations and infilled with ReadyBlock building blocks. ReadyFloor is suitable for first floor and ground floor constructions.