Engineers were able to keep the main London to Bristol railway line operational during major repair work thanks to a new rock-fall catch fence and drapery system from Maccaferri.
Building Products magazine was told that an on-going maintenance and structural stability plan by contractors, Skyline Rope Access, identified an 8m long tension-crack behind a large sandstone block 2/3rd of the way up the 23m deep cutting.